Renewable Project Readiness

A project needs to reach bankability and survive connection, permitting and structural reality.

The decision this supports

Whether to spend the next tranche on this project, and which single obstacle to clear before you do.

Where this sits in a project's life

Fig. 01Where this engagement sits in a project's lifecontent/engagements.ts — real engagement scope · Project-lifecycle demonstration
Illustrative
  1. 01
    Opportunity
  2. 02
    Site screeningTechnical screeningKreshnik Boshnjaku
  3. 03
    Regulatory / permittingPermitting & implementation pathway
  4. 04
    Grid / systemGrid & connection risk assessment
  5. 05
    Technical feasibilityPV / storage, structural & electrical feasibilityKreshnik Boshnjaku · Dr. Bledian Nela
  6. 06
    EconomicsProject economicsShend Boshnjaku
  7. 07
    Investment readiness
  8. 08
    Delivery
  9. 09
    Operation
FlowOps leadsFlowOps analyses / advisesSpecialist / partner inputClient / authority decision

The stage sequence is illustrative. The contribution mapping is not — every stage marked “FlowOps leads” or “analyses and advises” corresponds to an item in this engagement's stated scope.

What's included

  • Technical screening
  • PV / storage analysis
  • Grid and connection risk assessment
  • Structural and electrical feasibility, where relevant
  • Project economics
  • Permitting and implementation pathway

What we need from you

  • Site location and land control status — ownership, lease or option
  • Intended capacity and any existing layout or yield study
  • Connection correspondence with the network operator, including refusals
  • Permitting steps completed so far, and what is outstanding
  • For rooftops, the structural drawings or the age and type of construction

What you receive

  • Readiness scored across six dimensions, with the binding constraint named
  • Yield and project economics under your own financing assumptions, not generic ones
  • Connection risk assessed against how the network operator actually behaves
  • A permitting and implementation pathway with the sequence that applies to this site
  • A written answer on what to fix first, and what it is reasonable to spend to fix it

What you can do afterwards

Commit the next tranche of spend against a named constraint, or stop early — before a study budget is spent on a project the connection will not carry.

What usually happens next

Typically tender or EPC support, lender-facing technical documentation, or re-running the assessment once the binding constraint has moved.

Indicative duration

Typically 4–10 weeks for a single site; longer for a portfolio