Integrated Resource Plan for a United States utility system
2023 · United States — Northern Indiana · Power system planning
Context
- Client type
- Academic — graduate capstone, University of San Francisco
- Role
- Author (MS Energy Systems Management, Fulbright Scholar)
- Geography
- United States — Northern Indiana
- Sector
- Power system planning
Academic work. The utility was the subject of study and was not a client of any kind.
Problem
Least-cost resource planning for a real utility system under multiple demand, fuel-price and policy scenarios.
Work performed
- Scenario construction across generation, storage and demand-side resources
- Least-cost capacity expansion modelling
- Comparison of pathways against reliability and cost criteria
Output
A full Integrated Resource Plan, and the modelling approach FlowOps now applies commercially.
What this shows
The disciplines this record evidences, on the same chain used everywhere else on this site.
Facing a similar problem?
Work of this kind is scoped and bought as one of these engagements.
- Power System & Resource PlanningWhat to build, in what order, and whether the target you have been given is deliverable by the system that has to carry it.Typically 3–6 months, depending on data availability and the number of scenarios →
- Renewable Project ReadinessWhether to spend the next tranche on this project, and which single obstacle to clear before you do.Typically 4–10 weeks for a single site; longer for a portfolio →
Bring us the next decision.
Discuss a project →We reply within two business days.